Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/jspui/handle/123456789/13485
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorVaca Salazar, Diego Javier-
dc.contributor.authorRuiz Ruiz, Martha Isabel-
dc.date.accessioned2015-11-27T14:53:44Z-
dc.date.available2015-11-27-
dc.date.issued2015-
dc.identifier.citationRuiz Ruiz Martha Isabel.(2015).Examen de auditoría integral al Gobierno Autónomo Descentralizado Parroquial Rural de General Proaño, por el periodo comprendido entre el 1 de enero al 31 de diciembre de 2013.(Trabajo de titulación de magister en auditoría integral).UTPL.Macases_ES
dc.identifier.other1165593-
dc.identifier.urihttp://dspace.utpl.edu.ec/handle/123456789/13485-
dc.descriptionEl presente trabajo de fin de titulación en Auditoría Integral al Gobierno Autónomo Descentralizado Parroquial Rural de General Proaño, que cubre el examen al componente de obras públicas, construcciones y edificaciones, por ser el más relevante en los estados financieros y para el cumplimiento de la misión de la entidad. Se obtuvo un conocimiento integral que permitió mejorar la administración. En cumplimiento a la primera fase de la auditoría, se desarrollo la planificación preliminar y específica. Se preparó y se aplicaron los cuestionarios de control interno aplicados al área Gobernante representado por el Presidente, al área Financiera y al área de Planificación, de los mismos se determinó el nivel de riesgo y el nivel de confianza, se establecieron los programas de auditoría para cada enfoque de la auditoría integral. En la ejecución se aplicaron los programas de trabajo que contienen los procedimientos, a fin de desarrollar los hallazgos, obtener evidencia suficiente y competente, para la preparación del informe de auditoría integral. El trabajo se concluyó con la comunicación de resultados de los hallazgos a los funcionarios relacionados con el examen y se coordinó el cronograma de implementación de las recomendaciones requeridas para disminuir los riesgos y lograr los objetivos institucionales.es_ES
dc.description.abstractThis work order degree in Integral Audit of the Regional Government Decentralized Rural General Proaño Parish, which covers the examination component of public works, buildings and construction, as the most important in the financial statements and for the fulfillment of the mission of the entity. A comprehensive knowledge that improved the administration was obtained. Pursuant to the first phase of the audit, the preliminary development and specific planning. It was prepared and internal control questionnaires applied to the Ruler area represented by the President, the Financial area and the area of planning, the same level of risk and the confidence level was determined, they applied audit programs were established to each approach to comprehensive audit. In implementing the work programs containing procedures, to develop the findings, obtained sufficient competent evidence for the preparation of the comprehensive audit report were implemented. The work was concluded with the reporting of results of the findings to officials involved in the review and the timetable for implementation of the recommendations required to reduce risks and achieve corporate goals are coordinated.es_ES
dc.languagespaes_ES
dc.subjectAdministración públicaes_ES
dc.subjectAuditoría administrativaes_ES
dc.subjectAuditoria integrales_ES
dc.subjectInnovación organizacionales_ES
dc.subjectMagister en auditoría integral-Tesis y disertaciones académicases_ES
dc.titleExamen de auditoría integral al Gobierno Autónomo Descentralizado Parroquial Rural de General Proaño, por el periodo comprendido entre el 1 de enero al 31 de diciembre de 2013es_ES
dc.typemasterThesises_ES
Appears in Collections:Magíster en Auditoría Integral

Files in This Item:
File Description SizeFormat 
Ruiz_Ruiz_Martha_Isabel.pdf1.06 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Admin Tools