Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/jspui/handle/20.500.11962/22417
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorCervantes Fernández, Luis Arturoes_ES
dc.contributor.authorRamos Fierro, Mario Raúles_ES
dc.date.accessioned2018-05-17T00:03:50Z-
dc.date.available2018-05-17T00:03:50Z-
dc.date.issued2018es_ES
dc.identifier.citationRamos Fierro, Mario Raúl. (2018). Diseño e implementación de mapa de riesgos y plan de mitigación para la Jefatura de Agua Potable del Gobierno Autónomo Descentralizado Municipal del Cantón Las Naves. (Trabajo de Titulación de Magister en Auditoría Integral). UTPL, Guaranda.es_ES
dc.identifier.other1280436es_ES
dc.identifier.urihttp://dspace.utpl.edu.ec/handle/20.500.11962/22417-
dc.descriptionResumen:El presente trabajo de investigación tiene por objeto implementar el mapa de riesgo y plan de mitigación en el que se va a poner en práctica los conocimientos obtenidos en las distintas materias recibidas en la maestría y se inició seleccionando a la Jefatura de Agua Potable y Alcantarillado, para poder verificar el funcionamiento y ejecución que lo realizan para dar un buen servicio a la colectividad. A través del Estatuto por Procesos, Plan de Desarrollo y Ordenamiento Territorial, Plan Operativo Anual, se obtuvo una visión general de componente a auditar elaborando el Informe de Planificación Preliminar, posteriormente se evaluó los controles internos existentes tanto en auditoría financiera, de gestión, de cumplimiento y control interno con matrices de riesgos obteniendo el nivel de riesgo y de auditoria y se elaboró el informe de auditoría específico. Con estos resultados se elaboró los programas de auditoría y se aplicó en el GAD Las Naves, evidenciando deficiencias que fueron comunicados por escrito en reunión con la presencia del Alcalde, Director y Jefe de Agua Potable y Alcantarillado.es_ES
dc.description.abstractThe objective of this research work is to implement the risk map and mitigation plan in which the knowledge obtained in the different subjects received in the master's degree will be put into practice and started by selecting the Water and Sewage Department, to be able to verify the operation and execution that they carry out to give a good service to the community.Throughthe Statute for Processes, Development Plan and Territorial Planning, Annual Operative Plan, a general overview of the component to be audited was obtained, elaborating the Preliminary Planning Report, afterwards the internal controls were evaluated, bothin financial audit, management, compliance and internal control with risk matrices obtaining the level of risk and audit and the specific audit report was prepared. With these results, the audit programs were elaborated and applied in the GAD Las Naves, evidencing deficiencies that were communicated in writing in a meeting with the presence of the Mayor, Director and Head of Drinking Water and Sewerage-
dc.language.isospaes_ES
dc.subjectAdministración pública - Guranda (Bolívar, Ecuador)es_ES
dc.subjectGestión de riesgos.es_ES
dc.subjectControl interno.es_ES
dc.subjectMagister en auditoría integral - Tesis y disertaciones académicases_ES
dc.titleDiseño e implementación de mapa de riesgos y plan de mitigación para la Jefatura de Agua Potable del Gobierno Autónomo Descentralizado Municipal del Cantón Las Naveses_ES
dc.typebachelorThesises_ES
Appears in Collections:Magíster en Auditoría Integral



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Admin Tools