Por favor, use este identificador para citar o enlazar este ítem: http://dspace.utpl.edu.ec/handle/123456789/13492
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMurillo Torres, Kleber Guillermoes_ES
dc.contributor.authorZambrano Dávila, Edgar Eduardoes_ES
dc.date.accessioned2015-11-30T14:08:57Z-
dc.date.available2015-11-30-
dc.date.issued2015es_ES
dc.identifier.citationZambrano Dávila, E. E. Murillo Torres, K. G. (2015) Examen de Auditoría Integral a los procesos de Contratación Pública de la Dirección General del Personal de la Armada, del periodo del 01 enero al 31 Diciembre del 2013 [Tesis de Posgrado, Universidad Técnica Particular de Loja]. Repositorio Institucional. https://dspace.utpl.edu.ec/handle/123456789/13492es_ES
dc.identifier.otherCobarc: 1165681es_ES
dc.identifier.urihttps://bibliotecautpl.utpl.edu.ec/cgi-bin/abnetclwo?ACC=DOSEARCH&xsqf99=86617.TITN.es_ES
dc.descriptionResumen:El examen especial de auditoría integral practicada a la Unidad de Compras, consideró el análisis del control interno; cumplimiento legal, información Financiera y la gestión de la entidad. Además entregará recomendaciones que permitirá aportes para mejorar los sistemas de control, gestión, cumplimiento de la Unidad de Compras Públicas de la Dirección General de Personal. A través de la evidencia obtenida se pudo expresar un dictamen razonable en los resultados obtenidos de las operaciones administrativas y financieras de la Unidad de Compras Públicas, excepto porque existen procesos de contratación pública que no han sido finalizados en el SOCE, no existe un archivo físico o Digital completo del año 2013, no existe segregación de funciones en lo referente a los procesos especiales donde e Jefe de la Unidad de Contratación realiza las calificaciones de ofertas presentadas, no existe una buena planificación para la adquisición de pasajes aéreos y de correspondencia, no existe un PAC publicado para el año 2013 y finalmente no se publican todos los documentos establecidos por la Resolución INCOP-054-2011 Lo expuesto se encuentra reflejado en el informe de auditoría integral en forma detallada.es_ES
dc.description.abstractAbstract: The Special Integral Auditing Exam that was worked based on the information gather from the Human Resources Headquarters, it has been developed considering the analysis of the internal control components, the strict lawful parameters related with the public administration procedures, financial Information and managment. It will also give recommendations that will be used for administrative and financial Internal Control Systems and finally it will also give a standard model to be applied in other Naval Bases, except for the fact that there are Public Acquisitions procedures that have not been finish on the (SOCE), there is no complete physical or digital files of the acquisitions processes of 2013, there is no function segregation regarding special acquisitions processes, there is lack of planning to purchase air tickets and mail, there is no Annual Acquisitions Plan published for 2013, and lack of documents established by Resolution INCOP - 054-2011 that are not published in the Government s System. The statement will be reflected in the comprehensive audit in detail report, and will assess the impact and institutional administration.es_ES
dc.languagespaes_ES
dc.language.isospaes_ES
dc.subjectEcuador.es_ES
dc.subjectTesis digital.es_ES
dc.titleExamen de Auditoría Integral a los procesos de Contratación Pública de la Dirección General del Personal de la Armada, del periodo del 01 enero al 31 Diciembre del 2013es_ES
dc.typemasterThesises_ES
Aparece en las colecciones: Magíster en Auditoría Integral

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Zambrano_Davila_Edgar_Eduardo.pdf2.74 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.

Herramientas de Administrador