Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/handle/123456789/15391
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorEsparza Villalba, Carmen Antonieta-
dc.contributor.authorRamírez Jiménez, Maritza Eugenia-
dc.date.accessioned2016-08-03T20:29:41Z-
dc.date.available2016-08-03-
dc.date.issued2016-
dc.identifier.citationRamírez Jiménez, Maritza Eugenia. (2016). Análisis de la estabilidad del talud de la Casa de Máquinas, utilizando el método de elementos finitos y equilibrio límite del Proyecto Hidroeléctrico Delsitanisagua 180MW. (Trabajo de Titulación de Ingeniero en Geología y Minas). UTPL, Lojaes_ES
dc.identifier.other1180254-
dc.identifier.urihttp://dspace.utpl.edu.ec/handle/123456789/15391-
dc.descriptionEn la presente investigación hace referencia al análisis de la estabilidad del talud de la Casa de Máquinas, utilizando el método de elementos finitos y equilibrio al límite del Proyecto Hidroeléctrico Delsitanisagua 180MW. La meta principal de esta investigación es el análisis de la estabilidad del Talud izquierdo ubicado en la zona de Tubería de Presión para lograr esto, se recurrió a modelar el perfil del talud con la ayuda del software GeoStudio (SLOPE/W) y el software Phase2 (versión 8.0), los parámetros geomecánicos del suelo fueron tomados de ensayos geotécnicos realizados por la Empresa. Los resultados obtenidos afirmaron la condición inestable del sector, obteniendo un factor de seguridad de Fs= 1.23 (Equilibrio al límite) y Fs= 0.70 (Elementos finitos), no cumpliendo con los criterios de estabilidad conforme a obras de envergadura de un factor de seguridad igual o superior a 1.5. Mediante el modelamiento y un minucioso análisis se logró determinar los principales factores condicionante y desencadenantes que afecta a la estabilidad, así mismo posibles medidas de remediación asegurando la viabilidad del proyecto tanto técnica como económicamente.es_ES
dc.description.abstractThis research refers to the analysis of slope stability of the Powerhouse of Delsitanisagua 180MW Hydroelectric Project, using the finite element method and limit equilibrium. The main objective of this research is the analysis of the stability of the left batter located in the area of penstock. To achieve this it was model the profile of the slope using GeoStudio (SLOPE / W) software and Phase2 software (version 8.0). Geomechanical soil parameters were taken from geotechnical tests performed by the Company. The results determinated an unstable condition of the sector, obtaining a safety factor Fs = 1.23 (limit equilibrum) and Fs = 0.70 (finite elements), not meeting the criteria of stability according to major works for wich the safety factor should be greater than or equal to 1.5. By modeling and careful analysis it was determined the main determining and triggers factors that affect the stability and possible remediation measures to ensure the technical and economic feasibility of the Project.es_ES
dc.languagespaes_ES
dc.subjectGeologíaes_ES
dc.subjectDeslizamientos de tierra – Análisises_ES
dc.subjectTaludes – Estabilidades_ES
dc.subjectDovelas – Métodoes_ES
dc.subjectIngeniero en geología y minas – Tesis y disertaciones académicases_ES
dc.titleAnálisis de la estabilidad del talud de la Casa de Máquinas, utilizando el método de elementos finitos y equilibrio límite del Proyecto Hidroeléctrico Delsitanisagua 180MWes_ES
dc.typebachelorThesises_ES
Appears in Collections:Ingeniero en Geología y Minas

Files in This Item:
File Description SizeFormat 
Ramirez Jime nez Maritza Eugenia.pdf5.53 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.