Please use this identifier to cite or link to this item:
http://dspace.utpl.edu.ec/handle/123456789/16405
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Subia Guerra, Jaime Cristobal | - |
dc.contributor.author | Cueva Jiménez, María Gabriela | - |
dc.date.accessioned | 2017-01-10T13:49:24Z | - |
dc.date.available | 2017-01-10 | - |
dc.date.issued | 2016 | - |
dc.identifier.citation | Cueva Jiménez María Gabriela.(2016).Aplicación del método COSO-ERM mediante la implementación de mapas de riesgos y planes de mitigación de riesgos en la evaluación del control interno en el área de operación, custodia, recaudación y depósito del Servicio de Transporte Aéreo Económico TAE, convenio Fuerza Aérea Ecuatoriana y el Instituto Ecodesarrollo Regional Amazónico en beneficio al sector oriental en el periodo 2012-2015 /.(Trabajo de titulación de magister en auditoría integral).UTPL.Quito | es_ES |
dc.identifier.other | 1187135 | - |
dc.identifier.uri | http://dspace.utpl.edu.ec/handle/123456789/16405 | - |
dc.description | La presente investigación busca la aplicación del método COSO-ERM mediante la implementación de mapas y planes de mitigación de riesgos en la evaluación del control interno en el área de operación, custodia, recaudación y depósito del Servicio de Transporte Aéreo Económico TAE, convenio Fuerza Aérea Ecuatoriana y el Instituto Ecodesarrollo Regional Amazónico en beneficio al sector oriental en el periodo 2012-2015. La FAE dentro de sus actividades de apoyo a la sociedad ecuatoriana suscribió un convenio de cooperación con el Instituto Ecodesarrollo Regional Amazónico, El análisis desarrollado ha permitido aplicar el método COSO ERM; con los resultados obtenidos mediante observaciones, conocimientos y experiencia personal, se ha planteado supuestos de riesgos que se pueden presentar como factores internos o externos, evaluando su nivel de incidencia y busca brindar una respuesta a diferentes riesgos. El producto final es un documento que permitirá medir el riesgo; de este modo los Mapas de Riesgos se convierta en una herramienta básica de trabajo en el área de operación, custodia, recaudación y depósito del Servicio de Transporte Aéreo Económico TAE, convenio FAE y el ECORAE | es_ES |
dc.description.abstract | The present research seeks the application of the COSO-ERM method through the implementation of maps and risk mitigation plans in the evaluation of internal control in the area of operation, custody, collection and deposit of the TAE Economic Air Transport Service, Air Force agreement Ecuadorian Institute and the Regional Ecodesarrollo Amazonian Institute to benefit the eastern sector in the period 2012-2015. The FAE, within its support activities for Ecuadorian society, signed a cooperation agreement with the Instituto Ecodesarrollo Regional Amazónico, The analysis developed has allowed to apply the COSO ERM method; With the results obtained through observations, knowledge and personal experience, it has raised risks assumptions that can be presented as internal or external factors, evaluating their level of incidence and seeks to provide a response to different risks. The final product is a document that will measure the risk; In this way the Risk Maps will become a basic tool of work in the area of operation, custody, collection and deposit of the Economic Air Transport Service TAE, agreement FAE and the ECORAE | es_ES |
dc.language.iso | spa | es_ES |
dc.subject | Administración de riesgos | es_ES |
dc.subject | Auditoría administrativa | es_ES |
dc.subject | Control Interno | es_ES |
dc.subject | Magister en auditoría integral- Tesis y disertaciones académicas | es_ES |
dc.title | Aplicación del método COSO-ERM mediante la implementación de mapas de riesgos y planes de mitigación de riesgos en la evaluación del control interno en el área de operación, custodia, recaudación y depósito del Servicio de Transporte Aéreo Económico TAE, convenio Fuerza Aérea Ecuatoriana y el Instituto Ecodesarrollo Regional Amazónico en beneficio al sector oriental en el periodo 2012-2015 / | es_ES |
dc.type | masterThesis | es_ES |
Appears in Collections: | Magíster en Auditoría Integral |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Cueva_Jiménez_María_Gabriela.pdf | 8.38 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
Admin Tools