Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/handle/123456789/17843
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSanmartín Gutiérrez, Víctor Aurelio-
dc.contributor.authorAbad Pérez, Claudio David-
dc.date.accessioned2017-05-11T20:57:15Z-
dc.date.available2017-05-11T20:57:15Z-
dc.date.issued2017-
dc.identifier.citationAbad Pérez, Claudio David. (2017). Evaluación de los procesos productivos en pequeña Minería, en la Planta de beneficio P G condominio Norte, distrito minero Nambija. Provincia Zamora Chinchipe – Ecuador. (Trabajo de Titulación de Ingeniero en Geología y Minas ). UTPL, Lojaes_ES
dc.identifier.other1265110-
dc.identifier.urihttp://dspace.utpl.edu.ec/handle/123456789/17843-
dc.descriptionLa presente investigación se la realizó en la Planta de beneficio “P G”, sector Nambija, parroquia San Carlos de las minas, cantón Zamora; provincia de Zamora Chinchipe. El propósito es determinar la eficiencia de la planta con los diferentes procesos empleados. Se muestreó de manera sistemática en diferentes puntos como son: Cabeza, artesa, salida de la tubería, bayetas y relaves. El mineral muestreado de cada uno de estos puntos fue llevado al laboratorio beneficio de minerales, para realizar los ensayos correspondientes. En el análisis mineralógico, se llegó a determinar los siguientes elementos: cuarzo, calcita, hematita, minerales que constituyen un skarn. La eficiencia de la planta “P G” es de 63.58 %. Los porcentajes analizados de oro (Au) son: artesa 45.26 %, concentrado 18.32% y los relaves 28.44 %. El gasto energético es de 156.6 Kwh, tomando en cuenta los tres motores que se utilizó en el proceso. Gasto hídrico realizado en los días de operación fue de 221.91 m3.es_ES
dc.description.abstractThese present research was carried out in the benefit plant "P G", Nambija sector, San Carlos de las Minas Parish, Zamora Canton; Province of Zamora Chinchipe. The purpose is to determine the efficiency process of the plant with the different processed used. It was sampled in a systematic way in different points such as: Head, trough, exit of the pipe, sluice concentrate. The mineral sampled from each of these points, they were taken to the laboratory of minerals benefit, to realize the corresponding essays. In mineralogical analysis, the following minerals determined were: quartz, calcite, hematite, minerals that constitute a skarn. The efficiency of the "P G" plant is 63.58%. The analyzed percentages of gold (Au) are: trough 45.26%, concentrate 18.32% and tailings 28.44%. Energy expenditure is 156.6 Kwh, considering three engines which were used in the process. Water consumption was 221.91 m3.es_ES
dc.language.isospaes_ES
dc.subjectMinería San Carlos – Zamora Chinchipe(Ecuador)es_ES
dc.subjectMineral muestreado – Ensayoes_ES
dc.subjectMinerales – Ensayoes_ES
dc.subjectIngeniero en geología y minas – Tesis y disertaciones académicases_ES
dc.titleEvaluación de los procesos productivos en pequeña Minería, en la Planta de beneficio P G condominio Norte, distrito minero Nambija. Provincia Zamora Chinchipe – Ecuadores_ES
dc.typebachelorThesises_ES
Appears in Collections:Ingeniero en Geología y Minas

Files in This Item:
File Description SizeFormat 
ABAD PÉREZ CLAUDIO DAVID.pdf2.18 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.