Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/handle/20.500.11962/29411
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSoto Luzuriaga, John Egvertoes_ES
dc.contributor.authorRodríguez Hidalgo, Deisy Mayuri.es_ES
dc.date.accessioned2021-12-20T13:49:11Z-
dc.date.available2021-12-20T13:49:11Z-
dc.date.issued2021es_ES
dc.identifier.citationRodríguez Hidalgo, D. M. Soto Luzuriaga, J. E. (2021) Análisis cinemático del túnel de carga de la hidroeléctrica regional con el fin de determinar su posible mecanismo de falla en zonas sin revestimiento [Tesis de Posgrado, Universidad Técnica Particular de Loja]. Repositorio Institucional. https://dspace.utpl.edu.ec/handle/20.500.11962/29411es_ES
dc.identifier.otherCobarc: 1350857es_ES
dc.identifier.urihttps://bibliotecautpl.utpl.edu.ec/cgi-bin/abnetclwo?ACC=DOSEARCH&xsqf99=128109.TITN.es_ES
dc.descriptionResumen: La central hidroeléctrica Regional, fue propuesta como parte de los megaproyectos enfocados a la restructuración de la matriz energética del país. Está ubicada al sur del Ecuador y se sirve de las aguas de la central Nacional. Para analizar la cinemática del macizo rocoso en donde se implanta el túnel de carga de la central hidroeléctrica y evaluar su comportamiento estructural, se han aplicado métodos convencionales de análisis de estabilidad de taludes y software, haciendo énfasis en las secciones que, por cuestiones técnico administrativas de la empresa a cargo de sus operaciones quedaron sin revestimiento, Adicionalmente, se realizó la correlación entre la geología regional y las estructuras geológicas de primer orden (lineamientos, estructurales, fallas y pliegues). Cerca de cinco años de operación continua, se considera el análisis del estado geomecánico de las discontinuidades, la correlación de la información inicial con la que se definió a la calidad del macizo rocoso fue necesaria para concluir que el diseño y la construcción realizada cumple con los criterios de aceptabilidad estudiados, permitiendo recomendar inspecciones y monitoreo automatizado.es_ES
dc.description.abstractAbstract:The Regional hydroelectric plant was approach as part of the mega projects focused on the restructuring of the country energy matrix from 2008. It is located southern to Ecuador. To analyze the kinematics of the rocky massif where the charge tunnel of the hydroelectric plant is implanted and evaluate its structural behavior, emphasizing the sections that, for technical - administrative reasons of the company that directs it, it was decided that they should be left without lining, conventional slope stability analysis methods and software have been applied. Additionally, there is a correlation between regional geology and first order geological structures (lineaments, structural, faults and folds). Around five years of continuous operation, the analysis of the geomechanical state of the discontinuities is considered, the correlation of the initial information with which the quality of the rock mass was defined was necessary to conclude that the design and construction carried out complies with the studied acceptability criteria, allowing to recommend inspections and automated monitoring.es_ES
dc.language.isospaes_ES
dc.subjectEcuador.es_ES
dc.subjectTesis digital.es_ES
dc.titleAnálisis cinemático del túnel de carga de la hidroeléctrica regional con el fin de determinar su posible mecanismo de falla en zonas sin revestimientoes_ES
dc.typemasterThesises_ES
Appears in Collections:Maestría en Geotecnia Aplicada



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.