Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/handle/29.500.19856/82835
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorLandacay Ortega, Jonathan Alexanderes_ES
dc.contributor.authorRodríguez Intriago, Junior Hernánes_ES
dc.date.accessioned2026-08-24T15:48:41Z-
dc.date.available2026-08-24T15:48:41Z-
dc.date.issued2026es_ES
dc.identifier.citationRodríguez Intriago, J. H. Landacay Ortega, J. A. (2026) Diseño de una estrategia de reducción de costos logísticos en la cadena de suministro de la empresa Hielos Andes [Tesis de Grado, Universidad Técnica Particular de Loja]. Repositorio Institucional. https://dspace.utpl.edu.ec/handle/29.500.19856/82835es_ES
dc.identifier.otherCobarc: 1382434es_ES
dc.identifier.urihttps://bibliotecautpl.utpl.edu.ec/cgi-bin/abnetclwo?ACC=DOSEARCH&xsqf99=153627.TITN.es_ES
dc.descriptionResumen: La presente investigación tuvo como objetivo diseñar una estrategia de reducción de costos logísticos en la cadena de suministro de Hielos Andes S.A. (HIANDESA), empresa productora de bloques de hielo ubicada en el cantón La Libertad, provincia de Santa Elena. El estudio, de enfoque mixto y alcance descriptivo, empleó análisis documental, conteo de despachos, medición de temperatura, cronometraje y una encuesta a quince informantes. Se calculó un costo logístico anual de USD 87.660, equivalente al 11,39 % del ingreso potencial, y se identificó la restricción del sistema en la etapa previa a la carga, que representó el 34,4 % del ciclo. La medición instrumental mostró que la limitación de la infraestructura de conservación es térmica y no volumétrica, con una temperatura promedio de −4,8 °C frente a los −10 °C requeridos. Con base en estos resultados, se desarrolló una propuesta de rehabilitación térmica de la cámara, optimización de rutas, planificación de la demanda estacional y registros de despacho con indicadores. La evaluación determinó un período de recuperación de 7,6 meses y un valor actual neto positivo en los tres escenarios.es_ES
dc.description.abstractAbstract: The present research aimed to design a logistics cost reduction strategy for the supply chain of Hielos Andes S.A. (HIANDESA), a block ice manufacturing company located in the canton of La Libertad, province of Santa Elena. The study, which used a mixed-methods approach and a descriptive scope, employed documentary analysis, dispatch counting, temperature measurement, time measurement, and a survey of fifteen informants. An annual logistics cost of USD 87,660 was calculated, equivalent to 11.39% of potential revenue, and the system constraint was identified in the stage prior to loading, which represented 34.4% of the cycle. Instrumental measurement showed that the limitation of the storage infrastructure is thermal rather than volumetric, with an average temperature of −4.8 °C compared with the required −10 °C. Based on these results, a proposal was developed involving the thermal rehabilitation of the cold room, route optimization, seasonal demand planning, and dispatch records with indicators. The evaluation determined a payback period of 7.6 months and a positive net present value in all three scenarios.es_ES
dc.language.isospaes_ES
dc.subjectEcuador.es_ES
dc.subjectTesis digital.es_ES
dc.titleDiseño de una estrategia de reducción de costos logísticos en la cadena de suministro de la empresa Hielos Andeses_ES
dc.typebachelorThesises_ES
Appears in Collections:Logística y Transporte



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.