Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/handle/29.500.19856/84304
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorPaccha Soto, Diego Paúles_ES
dc.contributor.authorCajas Pérez, Stive Israeles_ES
dc.date.accessioned2026-09-23T13:44:38Z-
dc.date.available2026-09-23T13:44:38Z-
dc.date.issued2026es_ES
dc.identifier.citationCajas Pérez, S. I. Paccha Soto, D. P. (2026) Evaluación de riesgos psicosociales en el personal de construccion de la Planta de Procesamientos Orenas S.A mediante el software F-Psico 4.1. [Tesis de Posgrado, Universidad Técnica Particular de Loja]. Repositorio Institucional. https://dspace.utpl.edu.ec/handle/29.500.19856/84304es_ES
dc.identifier.otherCobarc: 1383136es_ES
dc.identifier.urihttps://bibliotecautpl.utpl.edu.ec/cgi-bin/abnetclwo?ACC=DOSEARCH&xsqf99=154328.TITN.es_ES
dc.descriptionResumen:Este estudio evaluó los riesgos psicosociales en el personal de construcción de la Planta de Procesamiento Orenas S.A. Metodológicamente, la investigación fue cuantitativa, descriptiva, transversal y no experimental, aplicándose un censo a los 15 trabajadores operativos mediante el método F-Psico 4.1. Los resultados demostraron que el apartado Tiempo de Trabajo es la vulnerabilidad más crítica, con un 80% de riesgo acumulado (66.7% muy elevado y 13.3% elevado). También, Participación/Supervisión registró un 53.3% de riesgo acumulado debido a los estilos de mando. Por otro lado, Variedad/Contenido de la Tarea destacó como fortaleza, ubicando al 93.3% en situación adecuada. Concluyendo que la rigidez horaria y las extensas jornadas afectan la recuperación y la conciliación familiar del personal. Por lo tanto, se requiere implementar un plan de intervención enfocado en optimizar descansos, ejecutar pausas activas y capacitar en liderazgo participativo, garantizando el cumplimiento de la normativa de seguridad vigente en Ecuador.es_ES
dc.description.abstractAbstract: This study evaluated psychosocial risks among the construction personnel at the Orenas S.A. processing plant. Methodologically, the research was quantitative, descriptive, cross-sectional, and non-experimental, involving a census of the 15 operational workers using the F-Psico 4.1 method. The results showed that the "Working Time" category represented the most critical vulnerability, with an 80% cumulative risk (66.7% very high and 13.3% high). Additionally, "Participation/Supervision" recorded a 53.3% cumulative risk due to management styles. Conversely, "Task Variety/Content" emerged as a strength, with 93.3% of the staff falling within the adequate range. The study concluded that rigid schedules and long working hours negatively impact personnel recovery and work-life balance. Therefore, an intervention plan is required to optimize rest periods, implement active breaks, and provide training in participatory leadership, while ensuring compliance with current safety regulations in Ecuador.es_ES
dc.language.isospaes_ES
dc.subjectEcuador.es_ES
dc.subjectTesis digital.es_ES
dc.titleEvaluación de riesgos psicosociales en el personal de construccion de la Planta de Procesamientos Orenas S.A mediante el software F-Psico 4.1.es_ES
dc.typemasterThesises_ES
Appears in Collections:Magister en Seguridad industrial mención en Prevención de Riesgo Laborales



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.