Please use this identifier to cite or link to this item: http://dspace.utpl.edu.ec/jspui/handle/123456789/15010
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorSanmartín Gutiérrez, Víctor Aurelio-
dc.contributor.authorGonzález García, Diego Polibio-
dc.date.accessioned2016-06-07T20:20:41Z-
dc.date.available2016-06-07-
dc.date.issued2016-
dc.identifier.citationGonzáles García, Diego Polibio. (2016). Evaluación de los procesos en la Planta de Beneficio “PITUCA II” sector Zamora. (Trabajo de Titulación de Arquitecto). UTPL, Lojaes_ES
dc.identifier.other1176929-
dc.identifier.urihttp://dspace.utpl.edu.ec/handle/123456789/15010-
dc.descriptionMediante la observación in situ del proceso productivo de la Planta de Beneficio PITUCA II, se recolectó datos y muestras en cada fase de operación, estos sirvieron para desarrollar los balances metalúrgicos y de recuperación de oro, así como balances de gasto hídrico y consumo energético (consumo de combustible), que tiene la planta, para la determinación de su eficiencia. Una vez recolectadas las muestras en campo, se realizó en el laboratorio los siguientes análisis: mineralógico, granulométrico, análisis al fuego y malla valorada de cada una de las etapas del mencionado proceso, con cuyos resultados se elaboraron los balances metalúrgicos para establecer la eficiencia de recuperación de oro, los resultados reflejan un valor de recuperación de oro Au de 58,52%, un gasto hídrico de 443 m³, consumiendo 45,9 galones de combustible (diésel) que provee la tracción al molino, y 15 galones de gasolina para el generador que suministra electricidad en las noches.es_ES
dc.description.abstractBy in situ production process of the processing plant PITUCA II observation, data and samples were collected at each stage of the operation, these have served to develop metallurgical and gold recovery balances and balances of water expenditure as well as consumption energy, in this case fuel consumption of a plant to determine its efficiency. With samples collected in the field, in the laboratory, were developed these studies: study mineralogical, granulometric, fire and mesh analysis valued each stage of that process and the results of the metallurgical balances were obtained to establish the efficiency of gold recovery, the results showed a value of Au gold recovery of 58.52%, a water spending of 443 m³, consuming 45.9 gallons of fuel (diesel) engine tried to pull the mill, and 15 gallons of gas for electricity generator tried at nightes_ES
dc.languagespaes_ES
dc.subjectMinería – Zamora Chinchipees_ES
dc.subjectOro – Recuperaciónes_ES
dc.subjectMina Pintuca II – Funcionamientoes_ES
dc.subjectBalances metalúrgicoses_ES
dc.subjectIngeniero en geología y minas – Tesis y disertaciones académicases_ES
dc.titleEvaluación de los procesos en la Planta de Beneficio “PITUCA II” sector Zamoraes_ES
dc.typebachelorThesises_ES
Appears in Collections:Arquitecto

Files in This Item:
File Description SizeFormat 
Gonzalez Garcia Diego Polibio.pdf5.41 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.